Contact Us

Phone
02 9938 3177

Email
mail@ccddrafting.com.au

Address
Unit 327 , 18-20 Dale st, Brookvale, NSW, 2100

Online Enquiry

* Required fields

2019

Tekla Visualizer | Shadows & walk through options

Posted By CD,
11/09/2019 15:28 PM
Some really great options here. with shadowing and affects. State of the art.

Keepit Dam Tamworth NSW | 90 tonne | Access Structure

Posted By CD,
06/09/2019 11:20 AM
Keepit Dam Tamworth NSW - 90 tonne infrastructure project Access structure & structural steel formwork Steelwork Modelled and delivered using Tekla structures Project to enable dam wall height to...

Oxford st Paddington NSW | 20 tonne | Commercial development

Posted By CD,
06/09/2019 11:00 AM
Oxford st Paddington NSW - 20 t commercial project Facade & awning Steelwork Modelled and delivered using Tekla structures Geometry and as built information had to be revised midway making this...

Monostringer Staircase | Pagewood NSW

Posted By CD,
06/09/2019 11:00 AM
Pagewood NSW - Residential project Monostringer winder staircase Steelwork Modelled and delivered using Tekla structures Elegant staircase for a tight stair void. Hardwood treads with concealed...

Pedestrian Bridge NSW | 40 tonne | Infrastructure project

Posted By CD,
06/09/2019 11:00 AM
Pedestrian Bridge NSW - 40 tonne infrastructure project Steel girders & balustrade  Steelwork Modelled and delivered using Tekla structures Bridge to enable access to walking tracks already...

College of Fine Arts NSW | 90 tonne | Commercial project

Posted By CD,
06/09/2019 11:00 AM
COFA Coffs Harbour NSW - 90 tonne Commercial project Structural steel & precast panels Steelwork & Precast Modelled and delivered using Tekla structures  

Cromer Storage King NSW | 220 tonne | Commercial development

Posted By CD,
06/09/2019 10:00 AM
Cromer Storage king NSW - 220 tonne commercial project 3800m2 internal space Steelwork Modelled and delivered using Tekla structures Precast fully coordinated via IFC sharing

Bayside Learning Centre VIC | 180 tonne | Commercial project

Posted By C Dowse,
04/09/2019 09:00 AM
Bayside Learning Centre VIC - 180 t commercial project 1030m2 internal space Steelwork Modelled and delivered using Tekla structures in record timing